Current News

Double Decker Structure

The Double Decker structure was designed by Liri Tent in 2012; it created a brand new market in the Chinese tent industry.

The Double Decker originally came from Europe, but now the chief engineer and owner Mr. Liang of Liri Tent has designed and produced it. It has gotten a lot of attention from clients in China and all over the world.  Apparently, the Double Decker means that it is a structure with two floors.
The actual Double Decker is divided into two kinds:
A: DDS A-shape model and clear-span is 10m to 30m and main profile is 300x125x5/8mm
B: ADDS dome-shape model,clear-span of 15m to 30m, and main profile is 300x125x5/8mm

The Double Decker frame is made out of high reinforced extruded aluminum in 4-groove aluminum hollow profile 6061/T6. All the steel parts are made out of hot-dipped galvanized steel, the internal ceiling sub-construction is supported by wooden beams and the second flooring board is made out of 28mm waterproof plywood. The roof coverings are made out of double-coated PVC which is flame retardant up to the European DIN 4102 B1, M2. Standard.

The Double Decker is made out of a modular system like that of a traditional clear-span structure. The length can be extended by 5m without a limit and it is the same as a normal structure which has many options to choose from.

Liri Tent double decker is always strong and durable with its 100km/h wind speed resistance. The tents special design for ADDS with curved beams and roof bar tensioning system which helps it to resist higher wind speed and snow loading capacity.

Normally, the double decker has no poles in the interior of the structure which makes it more spacious than another pole tent, frame tent, or steel tent designs. This structure helps it become a place of high class for events like golf, horse racing,carracing,and so on.

Share

Recent Posts

LiRi Architecture Technology 2024 Company Travel

Liri Architecture Technology (Guangdong) Co., Ltd started the annual trip, this trip was divided into…

2 months ago

Transparent Wedding Party Tent Video

The clear span of the New Party Tent is generally 3m-12m, the side height is…

2 months ago

Letter of thanks from the 19th Asian Games Organizing Committee

Recently, we got thanks letter from the Hangzhou Municipal Government, the Hangzhou Asian Games and…

2 months ago

Liri 2024 Fire Safety Drill

In order to improve employees' fire safety awareness and self-mutual rescue capabilities, Liri Architecture Technology…

2 months ago

Liri participated in the union staff basketball game

With the grand opening of the 2024 Doumen District "Trade Union Cup" Workers Games, employees…

3 months ago

China Sport Show 2024

The show will be held at Chengdu West China International Expo City from May 23…

4 months ago